The Construction begins:

 pictures from September and October 2005.

First the ground is readied

 

The footings are poured outlining the footprint of the new fire station.

 

The foundation walls are poured and in place on top of the footings. 

 

These pictures show the foundation has been back filled and the floor is being leveled.


Back to NGVFD Main

Next NGVFD Construction Page